Chesapeake Energy – Phase 2

Facility : Shop Building
Size : 44,500 SF
Location : Athens, PA
Services Provided :

Construction Management

As part of a four-phase new campus project, High Construction served as construction manager for the construction this 44,500 square foot pre-engineered metal building consisting of 14,333 square feet of office and 30,166 square feet of shop space on a 30.56 acre site in Athens, Pa. The building is fully sprinklered. The office includes 33 offices and a large conference room to seat 112 people. The office walls have the magnetic wall system and the level 5 finish, as well as Walltalkers nu-vu-rite wall covering and custom casework. The shop area contains a 20 ton, Class D top running, electric bridge crane, a fully operational wash bay and compressed air loo, and a work bay equipped with a recessed mechanic’s pit. Other project features include placed stone lay down yards using Triax – TX -160 geo-grid.

Contact Us

Address: 1853 William Penn Way, Lancaster, PA 17601

Phone: 717.291.2276